(94c) A New Reactive Scheduling Methodology for Front End Crude Oil and Refinery Operations Under Uncertainty of Shipping Delay
In this paper, a new reactive two-stage scheduling methodology for front-end crude oil and refinery operations has been developed to manage crude movements from ship unloading to refinery processing under uncertainty of shipping delay. The scope of the scheduling problem includes crude oil unloading from vessels to storage tanks at onshore berths, transfer of crude from these tanks to charging tanks, charging crude distillation units and further processing of crude inside the refinery, which includes crude distillation, cracking, coking, reforming, hydrotreating, product blending and component recovery.
The objective of the proposed scheduling methodology is to maximize the total operational profit; meanwhile, it should meet inventory and production demands, and try to maintain refinery plant’s normal operations under uncertainty of shipping delay. The scheduling model is a large-scale mixed integer nonlinear programming problem (MINLP). The efficacy of the proposed rescheduling model has been demonstrated by different case studies.