Aspen Hysys is used for process simulation from CO2 feed tank for this conceptual design study. Approximately 3,000 tons of CO2 will be annually provided for this pilot test process. Purity of CO2 stored in feed tank is about 95%.
Pipeline from CO2 feed tank is connected to platform topside process equipments. CO2 will be injected to the basin selected for this pilot test.
Flow assurance and risk analysis will be studied based on this designed process.
FEED design and detailed design will be performed through this study in the future. Finally, annually 3,000 tons of CO2 capacity will be operated based on this design package.