In this study, a steady-state simulation of the C3MR process was performed using ASPEN HYSYS™. And operating and capital cost of the process were calculated. The capital cost of the process was converted to equivalent annual cost in order to be compared with the operating cost. Then, the process was optimized to reduce total cost. Optimization formulation is developed to minimize the sum of operating cost and capital cost of the process. Temperature, pressure, and flow-rate of refrigerants were selected as optimization variables.
This research was supported by a grant from the LNG Plant R&D Center funded by the Ministry of Land, Transportation and Maritime Affairs (MLTM) of the Korean government.