Breadcrumb
- Home
- Publications
- Proceedings
- 2005 Annual Meeting
- Process Development Division
- Pilot Plant Economics
- (180a) The Effect of Pilot Plant Cost Estimates on Research Economics
Most research programs are evaluated in stages starting with a rough conceptual idea and progressing to a fairly detailed final program definition. The pilot plant requirements and design information start out as very ill defined and only sharpen as the process continues. However, the review process usually requires multiple cost estimates as it proceeds, many of which are at points in the process where adequate information to develop the pilot plant design much less the estimate is not available. This creates numerous problems which often result in significant estimating inaccuracy and uncertainty. The effects of this inaccuracy and uncertainty can range from difficulty in deciding if adequate economic information is available to make a final decision to inadequate funding and/or premature cancellation.
This presentation will discuss the different types of cost estimates commonly required and highlight the information required at each stage. The problems with their development and use will also be discussed. Suggestions for improving the quality of the cost estimates at each stage will be presented as well as some suggestions as to how to avoid the most common pitfalls.